Footpaths
Autumn Brown Sandstone
Another full garden overhaul, designed by a garden designer. Using autumn brown sandstone. We are returning in spring to build rendered raised planters, re turf the garden and add large timber arches over the path, and install lighting.
Brayton Footpath
235 metres of footpath, old Tarmac excavated and re-stoned ready for base.
Haxby Footpath
534 metres of footpath created to link New Earswick and Clifton Moor, York to improve the safety and connection routes of pedestrians and cyclists.