Civil Engineering
Timber Work
Pair of strong wooden gates made for a customer and two pairs of timber garage doors.
Parking Lay Bys York
Excavate and install kerbs for new parking for residents in York. Sub base finished with Tarmac.
York Driveway
Leeds Extension Footings
A pair of footings we installed, site clearance, excavate and pour concrete to builders specifications.
Brieghton Airfield
Skipwith Pavement
Vehicular crossing installation in Skipwith (dropped kerbs).
Deans Garden Centre
Brayton Footpath
235 metres of footpath, old Tarmac excavated and re-stoned ready for base.
Doncaster MDU
Completing the new hard core parking area (145 metres x 26 metres) at the Doncaster MDU.
Haxby Footpath
534 metres of footpath created to link New Earswick and Clifton Moor, York to improve the safety and connection routes of pedestrians and cyclists.